HOME about us PICS QUOTES CONTACTS  
 

Before: After:

 

Before: After:

 

Before: After:

 

 

 

Featured Project: Bathroom Remodel

Featured Specs:
Full Demolition
Re-Frame Walls & Replace Backer Board
Install "Recessed" Medicine Cabinets
Reface Bath Tub & Shower Area
Plumb in Dual Sinks
Re-Wire and Install New Lighting
Install and Plumb New Toilet
Install Two New 30" Vanities
Install Granite Countertop with Dual Sink Bowls
Replace Subfloor and Add Floor Leveler
Tile Floor and Walls (up 48") with Marquee Strip

Location: Woburn, MA

Time to Complete: 2 Weeks

Approx Price: "$1,000 Under Budget"

 

 

 

 

Before: After:

   
Home | About Us | Pics | Quotes | Contact Us
Copyright © EXTREME Construction & Contracting
designed by
Johnny Kula